  • Contract Value : AED 145 million
  • Contract Duration : 24 months
  • Client/ Owner : Rani International
  • Consultant : Development LLCM/s DSA/ Shankland Cox
  • Main Contractor : Al Naboodah Contracting
  • Completion Date : Contracting 2013
 

The Oberoi Centre, located in the Business Bay area of Dubai, consists of two towers, a 27-storey hotel tower and a 35-storey office tower. The hotel tower consists of a massive ballroom,, four international restaurants, large swimming pool, seven spa suites and 252 guest suites in addition to seven board meeting rooms at level 26 and a roof-top restaurant and bar at level 27. The office tower comprises 30 floors of offices with three levels of retail space and four levels of basement parking.

Trans Gulf Electromechanical provided the complete mechanical, electrical and plumbing services for the tower including the following

• HVAC
• Chilled Water Pumps
• Air Handling Units (AHU's / FAHU's) and Fan Coil Units
• Close Control Unit (CCU) and Split Unit
• Ventilation & Extract Fan
• Car Park Ventilation System
• Chilled Water Pressurization Unit
• Automatic/Manual Chemical Dosing System
• Building Management System (BMS)
• Electrical & ELV Systems
• LV Panels
• Automatic Transfer Switch (ATS)
• Bus Bar
• UPS
• Lighting Control System
• Earthing and Lighting Protection System
• Fire Alarm & Voice Evacuation System
• CCTV System
• IPTV System
• Room Management System
• Plumbing
• Drainage System / Submersible Pumps
• Water Supply System
• Water Filtration System / Water Treatment System
• LPG System
• Fire Fighting System
• Foam Deluge System

The air conditioning is supplied through Empower’s 3000 TR.