District Cooling Plant At Business Bay - Empower

15
Contract
duration (months)

ABOUT THE BUILD

The Empower District Cooling Plant (DCP-02) at Business Bay Dubai, will have a proposed built-up area of 101,625 sq ft with a total capacity of 43,750 TR.

Trans Gulf was responsible for the design and development of engineering drawings, plant and material selection, procurement, installation, commissioning and performance validation of the mechanical and electrical chilled water process plant for the district cooling system at Business Bay.

The scope of work included the following:

  • Design and construct 1 x 43,750 TR district cooling plant, and 7 x chiller modules of 5000 TR capacity
  • Supply and install 2 x thermal energy storage tanks of 4375 TR capacity each with a total capacity of 43,750 TR
  • Supply and install 13 transformers rated 2000 KVA
  • Supply and install 5 x MV switchgears on the ground floor feeding to 14 chillers of a total load of 23.4MW

The LV Room contains 13 MDBs to feed power to the building services and 37 VFDs, which are catering to respective equipment such as the primary, secondary and condenser pumps, the makeup water pumps, the cooling towers on the roof and building services at all levels. One backup generator of 315 KVA is provided for maintaining an essential power supply in case of a mains power supply failure.

Common area lights are controlled by a lighting control system. Exit and emergency lights are connected to a central battery emergency system. The fire alarm system is as per the requirement of Civil Defence Authority. The telephone network connection is from Du and design is as per Du design guidelines. The Low Current System consists of CCTV and an access control system.

The chilled water circuit comprises eight primary pumps and nine secondary pumps and the condenser circuit comprises eight condenser pumps and eight cooling towers cells on the roof. The chillers are located in the basement, the TES tanks on the ground floor, all pumps on the first floor and the cooling towers on the roof.

Upon completion the project will provide chilled water to the commercial and showroom buildings, residential buildings and town houses.

Project Slider
Project Slider
Project Slider
geometry
THE
FACTS

Air conditioning is supplied through Empower’s

43,750 TR

Total electrical load

23.4MW