Media One Tower

  • Contract Value : AED 57 million
  • Contract Duration : 18 months
  • Client/ Owner : Al Jaber Group
  • Consultant : M/s. Dewan Al Emara / Ian
  • Main Contractor : Banham & Associates Al ALEC
  • Completion Date : 2007
 

The Media One Tower is a 43-storey mixed-use tower. The 175 m skyscraper offers views of the Arabian Gulf, Emirates Golf Course and Dubai Marina. The hotel occupies the lower levels of the building with the offices on the upper levels. The local amenities and hotel lobby provide a large array of retail and restaurant options.

Trans Gulf Electromechanical provided complete mechanical, electrical and plumbing services for the tower including the following:

• HVAC
• Chilled Water Pumps
• Air Handling Units (AHU's / FAHU's) and Fan Coil Units
• Kitchen Ecology Unit / Kitchen Supply Fan
• DX – Units and Plate Heat Exchanger
• Extract / Pressurization Fans / Make up Air Fans
• Electrical & ELV Systems
• LV Panels
• UPS System and Generator
• Fire Alarm System & Voice Evacuation System
• Public Address / Background Music System
• CCTV System and Room Management System
• Access Control System
• Gate Barrier System and AV System
• IP Telephone System and Structured Cabling System
• Earthing & Lightning Protection System
• Plumbing
• Drainage (Waste & Soil) System
• Rain Water System
• Domestic Water Transfer & Booster Pump Set
• Water Filtration / Softener
• Hot Water Storage (Calorifiers)
• Fire Pump Set
• Fire Fighting & Sprinkler Protection System

Cooling load of the building is 1600 TR and the total electrical load is 6825 kW