Das Island Development - Construction of the Runway and Airport Facilities

  • Contract Value: AED 47.04 Million
  • Contract Duration: 24 Months
  • Client/ Owner: Abu Dhabi National Oil Co. (ADNOC)
  • Design Consultant: Jacobs Engineering
  • Main Contractor: Al Naboodah National Contracting Group
  • Completion Date: Ongoing
 

Scope of work includes supply, installation, testing and commissioning of the following:

Aviation:

- 400Hz Frequency converters and 28V DC Supply System - Baggage Handling and X-ray Screening System - Airfield Ground Lighting System - ATC equipment and PAPI System

Lighting:

- High mast lighting systems, street lighting, building lighting and solar lighting

Electrical Power systems:

- MV Substations, MV and LV Cabling / LV Switchgear / RMU
- Transformers – 1500kVA for ( ATC Tower) and 1000kVA for Hangar
- Diesel Generator – capacity 500kW
- Emergency Central Battery System
- UPS System

Low Current and Security systems:

- CCTV and Public Address Systems
- TEL and Data Systems
- Structured Cabling Network Systems
- Building Management and Fire Alarm Systems
- Access Control System

Mechanical & Plumbing Works:

- Fire Pump Stations
- HVAC Systems / Fire Fighting Systems / Plumbing and Drainage
- 200 ton Chiller Installation
- 165 ton AHUs
- 25 ton FCUs
- 17 l/s@28m chilled water pumps
- 90 ton package and split AC System
- 750 GPM fire pumps.
- 500 Gal Foam Deluge System
- IG - 55 Fire Protection System
- VESDA System