Client/owner :

Meraas Development

Completion date :

April 2018

  • SHARE PROJECT

Satwa Zone S

20
Contract
duration (months)

ABOUT THE BUILD

The aim of the project is to cater to the full infrastructure requirement of the residential, hotels and mixed-use development coming up in the Satwa area of Dubai. The project is split into two; the Enabling Works, and Road & Infrastructure Works.

  • Enabling Works comprises of Removal of HV/LV cables, street lights etc.
  • li>Road and Infrastructure Works comprises of new HV/LV networks,, street lighting, pumping station etc.

Trans Gulf Electromechanical LLC is executing the below mentioned scope:

HVAC

  • Split A/C units – supply, installation with piping
  • Testing and commissioning
  • Duct and accessories
  • Extractor fans and supply fans

Electrical & ELV Systems

  • MCC panels with PLC
  • Cabling (132kv, 33kv, 11kv)
  • Lighting and small power system
  • Structured cabling (tele and data)
  • Fire alarm system
  • Earthing system and lighting protection
  • Feeder pillar
  • RTU scada
  • Street lighting
  • UPS system

Plumbing

  • Irrigation system with pumps, piping and accessories
  • Sump pumps with piping and accessories
  • Firefighting system with pumps, piping and accessories
  • Sprinkler system and fire hose reel cabinet
  • FM 200
  • Girder crane
  • Surge analysis