ABOUT THE BUILD
The aim of the project is to cater to the full infrastructure requirement of the residential, hotels and mixed-use development coming up in the Satwa area of Dubai. The project is split into two; the Enabling Works, and Road & Infrastructure Works.
- Enabling Works comprises of Removal of HV/LV cables, street lights etc.
li>Road and Infrastructure Works comprises of new HV/LV networks,, street lighting, pumping station etc.
Trans Gulf Electromechanical LLC is executing the below mentioned scope:
HVAC
- Split A/C units – supply, installation with piping
- Testing and commissioning
- Duct and accessories
- Extractor fans and supply fans
Electrical & ELV Systems
- MCC panels with PLC
- Cabling (132kv, 33kv, 11kv)
- Lighting and small power system
- Structured cabling (tele and data)
- Fire alarm system
- Earthing system and lighting protection
- Feeder pillar
- RTU scada
- Street lighting
- UPS system
Plumbing
- Irrigation system with pumps, piping and accessories
- Sump pumps with piping and accessories
- Firefighting system with pumps, piping and accessories
- Sprinkler system and fire hose reel cabinet
- FM 200
- Girder crane
- Surge analysis