Eid Mubarak! We shall be closed for Eid al-Fitr on the first two days of Shawwal X

 

Client/owner :

Rani International

Completion date :

2013

  • SHARE PROJECT

Oberoi Centre

24
Contract
duration (months)
35
Storey

ABOUT THE BUILD

The Oberoi Centre, located in the Business Bay area of Dubai, consists of two towers: a 27-storey hotel tower and a 35-storey office tower. The hotel tower consists of a massive ballroom, four international restaurants, a large swimming pool, seven spa suites and 252 guest suites, in addition to seven board meeting rooms at level 26 and a rooftop restaurant and bar at level 27. The office tower comprises 30 floors of offices with three levels of retail space and four levels of basement parking.

Trans Gulf Electromechanical LLC provided the complete mechanical, electrical and plumbing services for the tower, including the following:

HVAC

  • Chilled water pumps
  • Air handling units (AHU's/FAHU's) and fan coil units
  • Close control unit (CCU) and split unit
  • Ventilation and extractor fan
  • Car park ventilation system
  • Chilled water pressurisation unit
  • Automatic/manual chemical dosing system
  • Building management system (BMS)

Electrical and ELV Systems

  • LV panels
  • Automatic transfer switch (ATS)
  • Busbar
  • UPS
  • Lighting control system
  • Earthing and lightning protection system
  • Fire alarm and voice evacuation system
  • CCTV system
  • IPTV system
  • Room management system

Plumbing

  • Drainage system/submersible pumps
  • Water supply system
  • Water filtration system/water treatment system
  • LPG system
  • Firefighting system
  • Foam deluge system

The air conditioning is supplied through Empower’s 3000 TR system

Project Slider
Project Slider
Project Slider
Project Slider
geometry
THE
FACTS

Air conditioning is supplied through Empower’s

3000 TR