ABOUT THE BUILD
This building comprises of 1 U/G basement (storage tanks & plant room), 3 floors of basement car parking, ground floor (entrance lobby/DG room/substation/security room), 7 podium levels of car parking, 19 floors of offices and 4 roof floors (MEP plant rooms).
The total built up area is 1,170,000sq ft.
The scope of work included:
HVAC
- Centrifugal chiller, cooling tower, chilled water pumps, condensed water pumps, side stream filtration pump, pressurisation pumps
- Air handling units (AHU’s/FAHU’s) and fan coil units
- Kitchen extract ducts/kitchen extract fan
- Parking ventilation with SA/RA plenums & fans
- Fan for general extract/toilet extract/ pressurisation/make up air
Electrical & ELV Systems
- HV and LV panels
- Standby generator
- Fire alarm system and voice evacuation system.
- Central battery system
- Lighting control system
- Public address/background music system
- CCTV system and building management system
- Access control system with intercom system
- Gate barrier system and AV system
- Turnstile system
- Earthing and lightning protection system
- IP-based security system
- Landscape and facade lighting
Plumbing
- Drainage (waste and soil) system
- Rainwater system
- Domestic water transfer and booster pump set
- Pre-action system
- Fire pump set
- Firefighting and sprinkler protection system
- FM 200 system
- Foam system
- Water heaters
The total electrical load is LV-7.5MW and HV-1.6 MW (chiller motors).
The total cooling load is 2100TR.