ABOUT THE BUILD

This building comprises of 1 U/G basement (storage tanks & plant room), 3 floors of basement car parking, ground floor (entrance lobby/DG room/substation/security room), 7 podium levels of car parking, 19 floors of offices and 4 roof floors (MEP plant rooms).

The total built up area is 1,170,000sq ft.

The scope of work included:

HVAC

  • Centrifugal chiller, cooling tower, chilled water pumps, condensed water pumps, side stream filtration pump, pressurisation pumps
  • Air handling units (AHU’s/FAHU’s) and fan coil units
  • Kitchen extract ducts/kitchen extract fan
  • Parking ventilation with SA/RA plenums & fans
  • Fan for general extract/toilet extract/ pressurisation/make up air

Electrical & ELV Systems

  • HV and LV panels
  • Standby generator
  • Fire alarm system and voice evacuation system.
  • Central battery system
  • Lighting control system
  • Public address/background music system
  • CCTV system and building management system
  • Access control system with intercom system
  • Gate barrier system and AV system
  • Turnstile system
  • Earthing and lightning protection system
  • IP-based security system
  • Landscape and facade lighting

Plumbing

  • Drainage (waste and soil) system
  • Rainwater system
  • Domestic water transfer and booster pump set
  • Pre-action system
  • Fire pump set
  • Firefighting and sprinkler protection system
  • FM 200 system
  • Foam system
  • Water heaters

The total electrical load is LV-7.5MW and HV-1.6 MW (chiller motors).

The total cooling load is 2100TR.