Eid Mubarak! We shall be closed for Eid al-Fitr on the first two days of Shawwal X

 

Client/owner :

Reality Capital

Completion date :

2011

  • SHARE PROJECT

I-Rise Tower

24
Contract
duration (months)
36
Storey

ABOUT THE BUILD

This state-of-the-art commercial building, located in Barsha Heights (formerly Tecom), Dubai, rises to 36 storeys and consists of 534 offices with 2,297 car parking spaces. The construction of this building was based on a distinctive architectural design, with a wave-like shape creating unique office layouts allowing for maximum natural light and providing a spectacular panoramic view. It covers an area of 1,930,254.86 sq ft.

Trans Gulf Electromechanical LLC provided the complete mechanical and electrical building services for the tower, including the following:

  • Air conditioning
  • Domestic water services
  • Drainage
  • Fire protection systems
  • Power supplies
  • Lighting
  • Fire alarm
  • Telephones
  • Communication systems
  • Security
  • Building management systems (BMS)

Total cooling load of the building is 1548 TR, and the total electrical load is 10,655kW

Project Slider
Project Slider
geometry
THE
FACTS

Total cooling load of the building

1548TR

Total electrical load

10,655kW