Client/owner :

Dubai Aviation Engineering

Completion date :

Expected in 2015

  • SHARE PROJECT

Dubai International Airport Expansion Phase III

24
Contract
duration (months)

ABOUT THE BUILD

Dubai International Airport Expansion Phase III involves the decommissioning and relocation of existing live services followed by the supply, installation, testing and commissioning of the following:

Aviation

  • Visual docking guidance systems
  • 400Hz frequency converters and pits, 400Hz cabling
  • Pre-conditioned air units and ducts

Lighting

  • High mast lighting systems/street lighting/building lighting

Electrical Power Systems

  • MV substations, MV and LV cabling/LV switchgear
  • Diesel generators of capacity up to 1650kVA
  • Dynamic UPS system for runway substations

Low Current and Security Systems

  • CCTV and WLAN systems for airport aprons
  • Structured cabling network systems
  • Building management and fire alarm systems
  • SCADA system for electricity and water
  • Gate barrier, bollards

Mechanical and Plumbing Works

  • Fire and potable water pump stations
  • HVAC systems/firefighting systems/plumbing and drainage
  • 34 tonne chiller installation
  • 300 tonne chiller relocation and refurbishment
  • Decommissioning/relocation of existing live services