EMPOWER
2014
15
|
Contract
duration (months) |
439
|
Rooms
|
The Empower District Cooling Plant (DCP-02) at Business Bay Dubai, will have a proposed built-up area of 101,625 sq ft with a total capacity of 43,750 TR.
Trans Gulf was responsible for the design and development of engineering drawings, plant and material selection, procurement, installation, commissioning and performance validation of the mechanical and electrical chilled water process plant for the district cooling system at Business Bay.
The scope of work included the following:
The LV Room contains 13 MDBs to feed power to the building services and 37 VFDs, which are catering to respective equipment such as the primary, secondary and condenser pumps, the makeup water pumps, the cooling towers on the roof and building services at all levels. One backup generator of 315 KVA is provided for maintaining an essential power supply in case of a mains power supply failure.
Common area lights are controlled by a lighting control system. Exit and emergency lights are connected to a central battery emergency system. The fire alarm system is as per the requirement of Civil Defence Authority. The telephone network connection is from Du and design is as per Du design guidelines. The Low Current System consists of CCTV and an access control system.
The chilled water circuit comprises eight primary pumps and nine secondary pumps and the condenser circuit comprises eight condenser pumps and eight cooling towers cells on the roof. The chillers are located in the basement, the TES tanks on the ground floor, all pumps on the first floor and the cooling towers on the roof.
Upon completion the project will provide chilled water to the commercial and showroom buildings, residential buildings and town houses.
Air conditioning is supplied through Empower’s
43,750 TR
Total electrical load
23.4MW