EMAAR Properties
2013
36
|
Contract
duration (months) |
439
|
Rooms
|
District Cooling Plant 3, also built for Emaar Properties, supplies chilled water to the Business Bay area including both business and residential premises.
Trans Gulf was responsible for the design and development of engineering drawings, plant and material selection, procurement, installation and commissioning and performance validation of the mechanical and electrical chilled water process plant for this district cooling system.
Trans Gulf’s scope of work included the following:
Air conditioning is supplied through Empower’s
5,000 TR