Eid Mubarak! We shall be closed for Eid al-Fitr on the first two days of Shawwal X

 

Client/owner :

Majid Al Futtaim

Completion date :

2012

  • SHARE PROJECT

Arabian Centre

36
Contract
duration (months)

ABOUT THE BUILD

Arabian Centre is a premium shopping and entertainment destination located in Al Mizhar, near Mirdif, Dubai. Sporting Arabian architecture with a modern twist, it hosts a wide variety of local and international brands as well as a food court, restaurants, hypermarket and cinemas.

The scope of works for Trans Gulf Electromechanical included the design, supply, installation and testing/commissioning of the following:

  • Electrical works as below to BS7671
  • HV and LV infrastructure including provision of five new sub stations
  • High voltage and low voltage distribution
  • Connections and control of CHP
  • External and internal lighting
  • Emergency lighting to BS5266 and general power distribution
  • Fire alarm and voice evacuation to BS5839
  • SMATV, lightning protection, standby generators system
  • UPS, public address system, CCTV, data and voice
  • Disabled persons alarm network, external gas, water mains
  • Internal H&CWS distribution, CHW heating and cooling systems
  • Energy recovery ventilation, fire protection – sprinkler and FM200
  • WC extractor systems and above ground drainage
  • Sanitary ware installation

Project Slider
Project Slider
Project Slider