Dubai World Trade Centre New Exhibition Halls

  • Contract Value : AED 65 million
  • Contract Duration : 6 months
  • Client/ Owner : Dubai World Trade Centre
  • Consultant : Dar Al Handasah
  • Main Contractor : Khansaheb
  • Completion Date : 2010
 

Dubai World Trade Centre’s (DWTC) Sheikh Rashid halls are located between the Dubai Metro station and the existing exhibition halls on a site that was previously used as a car park. The structure covers a built-up area of around 40,000m2, with internal dimensions of 325mx96m. The average height of the building is 15m and the internal space can be partitioned to provide a series of smaller halls as required for individual events. The MEP systems have also been installed in a manner that ensures this flexibility of use.

The DWTC exhibition hall was a fast-track project with an immovable deadline. Trans Gulf began work on 1 April 2009 and installation and commissioning of the MEP systems was completed on time within a scheduled six-month timeframe. The project had an effective construction period of 90 days.

Trans Gulf installed the full MEP systems for the project. The building and systems are fully functional and have been in use since 1 October 2009.

• HVAC
• Chilled Water Pumps
• Air Handling Units
• Fan Coil Units
• Close Control Unit (CCU)
• Chilled Water Pressurization Unit
• Ventilating Fans
• Electrical & ELV Systems
• LV Panels and Cables
• Bus Bar
• Generator
• Fire Alarm and PABGM
• CCTV System and SMATV System
• Security & Access Control System
• Public Address System
• Central Battery, Lighting Control
• Air Sampling & Detection System
• Earthing & Lightning Protection System
• Telephone & Structural Cabling
• Plumbing
• Water Tanks and Pump Sets
• Drainage System
• Hot and Cold Water Supply System
• Fire Fighting & Sprinkler Protection System
• Fire Suppression System (FM 200)