Eid Mubarak! We shall be closed for Eid al-Fitr on the first two days of Shawwal X

Park Hyatt At Saadiyat Island - Abu Dhabi

  • Contract Value : AED 120 million
  • Contract Duration : 16 months
  • Client/ Owner : TDIC / AUH National Hotels
  • Consultant : M/S EHAF Associates / M/s Hill International
  • Main Contractor : ALEC
  • Completion Date : 2012
 

The Park Hyatt at Saadiyat Island, Abu Dhabi is, located on a nine-kilometre stretch of environmentally protected beach on Saadiyat Island. The hotel has 306 hotel rooms, suites and private villas that overlook Saadiyat Beach, the golf club or the hotel gardens.

The services provided by Trans Gulf included the following:

• HVAC
• Air Conditioning & Ventilation Systems
• DX Split Unit
• Exhaust Fans Fire Fighting and Protection Systems
• Electrical & ELV systems
• LV Panel (Sub Main Distribution Board (SMDB), Distribution Board (DB))
• Fire Alarm System
• Power & Lighting
• Telephone System
• Communication Systems and Security Systems
• Guest Room Management System
• Plumbing
• Drainage (Waste & Soil), Rain Water System
• Water Supply System
• Grey Water Systems
• LPG Gas

Special Features of the Project are:

• LEED Silver
• Chilled Water is fed through District Cooling Facility for the total Tonnage of 2,804TR.
• Total Electrical Connected Load 7,483kW

Cooling load of the project is 1525 TR and the total electrical load is 9327 kW