Medcare Hospital

  • Contract Value : AED 23 million
  • Contract Duration : 15 & 6 months
  • Client/ Owner : Dr. Moopens
  • Consultant : Ian Banham & Associates
  • Main Contractor : Al Hudaiba Contracting
  • Completion Date : 2006 & 2011
 

Medcare Hospital, Safa Park, Dubai (built for Dr.Moopen's Group) covers an area of 120m x 60m. The development incorporates a hospital building, six duplex villas, a service building and a parking area. The hospital rises from the basement to two storeys above ground level and also incorporates staff accommodation.

The services provided by Trans Gulf included the following:

• HVAC
• Air Cooled Chillers
• Chilled Water Pumps
• Air Handling Units (AHU / FAHU)
• Fan Coil Units (FCU)
• Close Control A/C Units
• Extract / Exhaust Fans
• Split Unit Air Conditioners
• Electrical & ELV Systems
• LV Panels
• Fire Alarm System
• UPS System
• Public Address System
• Structured Cabling for Telephone / Data System
• SMA TV System
• CCTV System
• Access Control and Time Attendance System
• Central Clock System
• Earthing System
• Generator Set
• Plumbing
• Drainage (Waste and Soil) and Rain Water System (Internal & External)
• Domestic Water Supply System (Domestic Water Transfer & Booster Pump Set)
• Water Filtration System
• Steam Generation System
• Fire Pump Set
• Supervised Automatic Sprinkler Protection and Conventional Wet Pipe Fire Fighting System
• Kitchen Hood Fire Suppression System